A stunning development with scenic backdrop of Dubai Water Canal
Casa Canal is a prime waterfront development along the Dubai Water Canal in Al Wasl, with scenic views from sky villas and penthouses for those who desire ultra-luxury living.
Developed by Meraas and Jumeirah Residences in La Mer, Jumeirah Asora Bay features 4 to 6-bedroom apartments, a 7-bedroom penthouse, and Ocean Mansions, with an estimated handover in 2029.
Exclusive Residences Serviced by Dorchester Collection
Developed by Ominiyat in collaboration with Dorchester Collection in Palm Jumeirah, the development features 20 4-bedroom duplexes with an estimated handover in 2027.
Developed by Emaar Properties in Emaar South, the development features 1 to 3-bedroom apartments and 3-bedroom townhouses. It is estimated to be handed over in Q4 2028.
Developed by Emaar Properties in Emaar South, the development features 1 to 3-bedroom apartments and 3-bedroom townhouses. It is estimated to be handed over in Q4 2028.
Developed by Mira Development in collaboration with Bentley Home in Meydan, Mira Villas features 5-bedroom ultra-luxury villas with an expected handover in Q1 2026.
Developed by MAG Group in Dubai Creekside, the development features 2 & 3-bedroom apartments and 12 8-bedroom mansions with an expected handover in Q4 2027.
An Ultra-luxury, off-plan residential project by Majid Al Futtaim in Tilal Al Ghaf that features 7 and 8-bedroom ultra-premium mansions with an expected handover in Q3 2026.
A Luxury Masterpiece Standing Tall in Palm Jumeirah
Developed by Omniyat in Palm Jumeirah, the development features 3 to 4-bedroom simplex, duplex and penthouses. The estimated completion date of The Alba Residences is in Q1 2028.
Developed by Hilton and Al Hamra Group in Al Hamra Village, Ras Al Khaimah. Features 38 ultra-luxury residences, penthouses, and sky palaces. The development is set to open in 2026.
Developed by Damac Properties between Emirates Road (E611) and Sheikh Mohammed Bin Zayed Road (E311). Estimated Completion in Q4 2028. Features 4 to 7-Bedroom Villas and Townhouses.
Developed by Saba Group in Cluster Q, Jumeirah Lake Towers (JLT). Completed within a record time frame of 20 months. Features studios, 1 to 5-bedroom apartments, and penthouses.